Here is an update for the Lynch Ave. Project:
Starting April 18, 2022: Environmental Solutions came in to remove any trees that were within the limits of the project this included the stumps.
On April 25, 2022: Peter’s Const. was on site to remove the asphalt, curb and gutter, and most of the driveway aprons.
On April 28, 2022: Feaker moved some equipment to the site. They are expected to start work on the sanitary sewer on the east end of Lynch Ave on Monday (5/2/2022).