Not much to report this week. Great Lakes Tv Seal Inc. televised the sewer systems and found a couple cracked storm pipe and a sag in the sanitary sewer. Feaker was back on site today(7/8/22) to fix the sag. They are planning to return on Monday(7/11/22) to repair the cracked storm sewer. Peter’s Const. is also scheduled to begin road construction on Monday. The street seems to be in good driving condition. Let me know if you have any questions or comments.